Concepedia

Concept

quality control

Parents

Children

13.7K

Publications

720.2K

Citations

40.6K

Authors

7.9K

Institutions

Robust Quality Engineering

1977 - 1990

During the period spanning 1977 to 1990, research converged on an integrated quality engineering framework that blends on-line process monitoring with off-line design and measurement planning. Efforts emphasis is placed on hybrid statistical process control, combining Shewhart charts with Cumulative Sum control to improve detection of small and persistent shifts, and on expanding multivariate monitoring to address correlations among quality characteristics. Off-line design of experiments, especially robust design methods and Taguchi parameter design, shaped manufacturability and reduced variation across settings, while comprehensive measurement planning and quality planning elevated quality management to a strategic activity spanning development and production. Inspections and acceptance sampling were analyzed with sensitivity to inspector performance and error impact, reinforcing a systems view of process control across domains.

Statistical QC methods and decision rules drive detection and error control, with emphasis on integrating Shewhart charts with CUSUM, robustness to outliers, and evaluation of false rejections and detection power [2], [17], [19], [15], [5].

Off-line QC emphasizes design choices that shape manufacturability and costs: parameter design (Taguchi), experimental design for fabrication, and crafting complete inspection plans to optimize performance [4], [20], [9].

Economic/management framing treats QC as design and policy: taxonomy of economically based procedures, economic selection of target quality, and quality planning and measurement as strategic activities [3], [9], [14], [12].

Inspection regimes and policy design examine acceptance sampling, optimal inspection levels, and the impact of inspector fallibility and inspection errors on process control [8], [15], [11], [7].

Measurement systems and planning across domains emphasize the Quality Measurement Plan, quality planning/analysis, and domain-specific QC like clinical chemistry to ensure reliability [18], [12], [13].

Integrated Quality Management Systems

1991 - 1997

Selective Total Quality Management

1998 - 2004

Certification Signaling in Quality

2005 - 2010

Integrated Quality Assurance

2011 - 2017

Quality 4.0 QC Governance

2018 - 2024